What is Synchronization ?

 “Synchronization is a crucial problem in grid-tied inverters operation and control research indicates that frequency, phase, and amplitude of voltage are the most crucial parameters that need to be measured and controlled for grid-tied application.”

Open-loop techniques can directly detect input signal parameters, while closed-loop techniques can reportedly reduce phase errors.

“In a closed loop system estimated value of phase is updated by adjusting through a feedback loop mechanism. This loop locks the estimated value of signal to its actual value,” they said. “Closed loop techniques are a better as compared to open loop method.”

Note:

the article will be developed further on the topic with more information . . . .

Comments

Popular Posts

Famous unsolved math problems

BESS Tenders for Grid-Scale Energy Storage Adoption in India

GHG accounting and its emission factors

Top EPC forms in Solar rooftop and Ground mounted in UAE and KSA

What is Fiscal Responsibility and Budget Management (FRBM) Act and its guidelines ?